Oppla case studies

Assessing how the ecosystem service approach can be used to demonstrate problems in protected areas such as rural abandonment, land-use intensification and social conflicts emerging from strict conservation practices.

Despite legal protection, mangroves were being cleared for shrimp farming by non-local investors. In a multi-day workshop, the ideas was to learn from local community stakeholders and participating scientists about the problems surrounding the conversion of mangrove ecosystems to shrimp aquaculture.

The aim was to develop potential solutions to the problems and communicate results to the authorities to take action. The main questions to be answered were: How to compare the value...

To create a development on a brownfield site where Green Infrastructure (GI) is integral to the layout of dwellings and create a sense of place whilst delivering a rich mix of housing tenures with a focus on affordability for local people.

Exploring which policy strategies can balance the supply of and demand for mountain ecosystem services in the future? Mountains provide many ecosystem services to both, people living in and outside the mountains. In the Swiss Alps study area, the number of farms abandoned is increasing and traditional farming systems are in decline. Therefore, as in many European mountain regions, the provision of essential services is at risk. At the same time, touristic activities and settlement...

To create a sustainable service station which has minimal impact on its surroundings and is sensitive to surrounding environment of the Cotswolds (AONB).

Encouraging collaboration by bringing together diverse perspectives on Dublin and its desired future.

In its 2016-2022 Development Plan the city has set out a vision for a ‘Sustainable, Resilient Dublin based on economy, environment and equity’ (1). The Development Plan’s principles for green infrastructure include sustainable buildings which should use ‘sustainable energy technologies and innovative design solutions such as living walls, roofs as well as solar panels’. NBS could help address climate change, environmental infrastructure, green infrastructure, open spaces and recreation,...

Resilient growth of peripheral settlements.

 SUPPORT FOR CONCENTRATED DECONCENTRATION. Sofia General Master plan with timescale 2030 has as one of its major goals to alleviate the investors’ development pressure to the capital City. It creates spatial preconditions for transition to a polycentric municipal urban structure by allocating considerable terrains for extension of the settlements around Novi Iskar.

Rotterdam aims to be 100 % climate-proof by 2025. This is the goal expressed in the city’s climate change adaptation programme. This means that by 2025 measures will already have been taken to ensure that each specific area is minimally disrupted by climate change both then and throughout the following decades. Furthermore, all urban planning in Rotterdam will take into account long-term foreseeable climate change while allowing for contingencies.

The ‘waterproof city’ is robust and...

Information on this page is hosted by Oppla