Oppla case studies

Several training and scoping workshops with stakeholders guided an assessment of the Taï Park’s multiple ecosystem services, and helped align it to the purpose of drumming-up support for conservation. This case illustrates the importance of intensive initial scoping prior to examining ecosystem services in more depth. Study results are now being used by park authorities to motivate increased government budget allocations, and to interest the international cocoa industry in co-financing the...

Green engine of development, metropolitan region of knowledge.

The vision was developed by key stakeholders in the process of preparation of the Regional Development Programme for the period 2014 – 2020.The Ljubljana urban region will respect the natural and cultural environment and its carrying capacity and will build its future on knowledge, innovation, creativity and the synergy between all important players and sectors. The region will be a healthy, attractive and...

Develop and test usable methods for valuation selected ecosystem services at the local and regional level, and promote their incorporation into the spatial planning process and in the broader decision making process in Slovakia.

To create a sustainable service station which has minimal impact on its surroundings and is sensitive to surrounding environment of the Cotswolds (AONB).

The release of an open public space with such dimensions in a densely-built city district offered a unique opportunity to restore the connection among the surrounding areas with a solid green lung.  The site was previously a brownfield land that needed remediation. (During the entire remediation operation, approximately 100,000 m³ of land was excavated) However, even the residents of the neighboring areas faced with initial skepticism the usefulness of a park in the specific location.

...

The land was in a vacant and derelict state and safety concerns were raised due to vandalisation, fly tipping, vehicle abandonment and fires. The conversion of the site into a new urban park presented an opportunity to address the anti-social behaviour and make the site a desirable area for positive activities and community development. South Lanarkshire Council provided the match funding for the project and applied for funding from the...

  • Preserve the remaining patch of riparian habitat while providing amenities to the residents of the dense urban center.
  • Identify best approach to flood control (prevention with a high, concrete retaining wall or cooperation by allowing the park to flood).
  • Integrate the existing building into the surrounding environment to create a cohesive landscape.
  • Connect the separated city to the natural riparian landscape to strengthen the community and cultural identity...

Evaluating how recent and forthcoming EU policy developments affect the levels of ecosystem services (ES) and natural capital (NC) in Europe. Many of Europe's natural habitats and species are in decline. While the EU has a number of policies in place to safeguard habitats and species, losses are ongoing for many habitats, species and associated ecosystem services.

The area is characterized by by the presence of two separate lakes connected by a tree-lined pathway. The first lake is used for the fishing while the second one is characterized by a more spontaneous development of wild flora and is the home of different bird species.
It aims to include : 
• morphological arrangement of the slopes of embankments produced by the extractive area for the future public use
• putting containment elements of the soil in particularly steep points...

Information on this page is hosted by Oppla