Oppla case studies

To provide 187 new homes for private and affordable housing and refurbish a Grade II* listed Hall, whilst retaining the views of Hanham Hills and achieving the 'Zero' carbon standard.

Strengthening local social capital by gathering and sharing community related data.

The main objective of our BIOVEINS proposal is to use functional diversity (FD) to highlight the mechanisms underpinning the link between GBI, taxonomic diversity (TD) and ecosystem services (ESs) provisioning, and to provide, together with local stakeholders, the ecological and interdisciplinary knowledge to identify the critical features of GBI, to guide the establishment, management and restoration of GBI, and to mitigate the effects of major urban global challenges, like habitat...

All of the challenges identified in the Bristol Development Framework Core Strategy (1) concern areas which would benefit from NBS. Furthermore, the 20:20 plan – Bristol’s Sustainable City Strategy (2) – has identified climate change as one of three key challenges. It acknowledges the potential for green infrastructure, such as trees, green walls and roofs, to minimise and mitigate the urban heat island effect, while Sustainable Urban Drainage Systems (SUDS) are seen as an important part of...

Rotterdam aims to be 100 % climate-proof by 2025. This is the goal expressed in the city’s climate change adaptation programme. This means that by 2025 measures will already have been taken to ensure that each specific area is minimally disrupted by climate change both then and throughout the following decades. Furthermore, all urban planning in Rotterdam will take into account long-term foreseeable climate change while allowing for contingencies.

The ‘waterproof city’ is robust and...

Addressing the steps needed to overhaul the economic development strategy of Málaga.

The area is characterized by by the presence of two separate lakes connected by a tree-lined pathway. The first lake is used for the fishing while the second one is characterized by a more spontaneous development of wild flora and is the home of different bird species.
It aims to include : 
• morphological arrangement of the slopes of embankments produced by the extractive area for the future public use
• putting containment elements of the soil in particularly steep points...

The main objective of our BIOVEINS proposal is to use functional diversity (FD) to highlight the mechanisms underpinning the link between GBI, taxonomic diversity (TD) and ecosystem services (ESs) provisioning, and to provide, together with local stakeholders, the ecological and interdisciplinary knowledge to identify the critical features of GBI, to guide the establishment, management and restoration of GBI, and to mitigate the effects of major urban global challenges, like habitat...

To mitigate the development of a 3.2km bypass by building a green land bridge to enable the historic West drive to be reinstated on its original line and provide landscape and habitat connectivity.

Information on this page is hosted by Oppla