Oppla case studies

Examining management scenarios related to the maintenance of a marina at the Dutch Wadden Sea Island Schiermonnikoog. Identifying how ecosystem services (ES) in a Natura 2000 area would be affected by different ways of depositing the dredging sludge. Gathering stakeholder feedback to advance the ES approach.

A grounded economy in symbiosis with the environment at different scales that provides for qualitative jobs anf healthy, inclusive and sustainable lifestyles.

The region will harness local economic opportunities and employment while also addressing environmental challenges. The creation of socioeconomic value will be more closely related to the territorial scale and actively include local stakeholders and assets.

RENATURALIZE THE LAGOON AND DEVELOP A NEW MODE OF SUSTAINABLE DEVELOPMENT.

Hamburg was the first major German city to launch a comprehensive Green Roof Strategy. Its goal is to green at least 70 per cent of both new buildings and suitable flat or gently pitched roofs that are being renovated. The Ministry for Environment, Climate, Energy, and Agriculture supports the project with three million euros until the end of 2024.

In 2014 the goal was set to create 100 hectare (ha) green roofs in Hamburg within one decade. Starting from 80 ha we are on track having...

A pilot mangrove restoration project in Costa Rica demonstrating how mangrove planting can benefit habitat and species conservation, whilst boosting the local economy. About 40% of Costa Rica’s mangroves were deforested following the collapse of the country’s banana boom in the 1980s. A vigorous fern species has taken over much of the deforested area, preventing the mangroves from re-establishing. A pilot restoration project of 30 ha of mangrove in a protected wetland was implemented,...

To create a community allotment that anyone can visit and is accessible to people with physical and/or mental ill health.

Increasing ecosystem service provision by creating multifunctional blue-green infrastructure.

The Greater London Authority (GLA) participants in the BRIDGE FP7  project identified the primary planning goals for the Central Activities Zone (CAZ)[1] as to: (a) increase green space; (b) improve air quality; (c) reduce the UHI effect (heat island) and (d) prevent flash floods, with climate change adaptation and mitigation seen as a cross cutting issue.

London has a number of plans aimed at addressing these challenges,...

  • Developing climate change adaptation; improving risk management and resilience.
  • Multi-functional nature-based watershed management and ecosystem restoration.
  • Preserve the remaining patch of riparian habitat while providing amenities to the residents of the dense urban centre.
  • Identify best approach to flood control (prevention with a high, concrete retaining wall or cooperation by allowing the park to flood).
  • Integrate the existing building...

Transforming an underused town square into a pavilion pf possibilities.

Information on this page is hosted by Oppla